The work

A selection of our projects:

A’dam Tower – Amsterdam North

Complete roofing installation for one of the Netherlands' most iconic buildings, also known as the Shell Tower or Overhoeks Tower. The work covered multiple roof levels, each with its own structural and functional requirements.

Material combination included bituminized glass fleece in poured bitumen, PIR insulation, Wedeflex D3/D4 (mechanically fastened and torched) and Resitrix SKW as the top layer. To support the wooden deck, insulated steel bases were individually installed in the roof structure.

The result: a load-bearing, weatherproof, and low-maintenance roof with a projected lifespan of at least 60 years. The roof is publicly accessible and features Europe’s highest swing.

Photos

  • ADT 4
  • ADT 5
  • 100m hoog uitzicht zonsopkomst
  • ADT 2
  • ADT 3
  • ADT 6
  • ADT 7
  • ADT 8
  • ADT 10
  • ADT 9
  • ADT 12
  • ADT 13
  • ADT 11
  • ADT 14
  • ADT 17



Datacenter AM3 – Science Park Amsterdam (21,000 m²)

Complete roof installation for one of the Netherlands’ most highly secured data centers. Executed under strict protocols, with full control over safety, progress, and finishing. Delivered without compromises.

Photos

  • Datacentre Am3 (01)
  • Datacentre Am3 (02)
  • Datacentre Am3 (03)
  • Datacentre am3 (04) luchtfoto



Conservatorium Hotel (formerly Stradivarius Hotel), Amsterdam

A technically demanding roof on a monumental building in the center of Amsterdam. Multiple roof types combined within just 1,500 m², using poured bitumen, glass foam, and Resitrix EPDM. Logistically complex, completed within a tight timeframe.

Photos

  • Stradivarius (04)
  • Stradivarius (01)
  • Stradivarius (02)
  • Stradivarius (03)
  • Stradivarius (05) luchtfoto


Diemen Shopping Center (17,000 m²)

A large area, physically demanding execution. Logistical complexity, limited crane access, and thousands of tons of material moved manually. Roof renovation completed without disruption to commercial activities.

Photos

  • WCD 1
  • WCD 2


ROC Amsterdam (5,000 m²)

Tightly planned, with rapid execution during the complete renovation of this school building over a single school holiday period. Perseverance and determination were key in successfully completing this project within the planned scope.

Photos


  • ROC Amsterdam (03)
  • ROC Amsterdam (01)
  • ROC Amsterdam (05)
  • ROC Amsterdam (06)
  • ROC Amsterdam (13)
  • ROC Amsterdam (12)
  • ROC Amsterdam (10)
  • ROC Amsterdam (09)
  • ROC Amsterdam (16)
  • ROC Amsterdam (14)
  • ROC Amsterdam (08)
  • ROC Amsterdam (11)
  • ROC Amsterdam (04)
  • ROC Amsterdam (15)
  • ROC Amsterdam (17) luchtfoto